• How long does it take? Most residential new constructions take 4 to 6 weeks from the initial consultation to final rolling, depending on site preparation needs.
  • When can I drive on it? You can typically walk on new asphalt immediately, but we recommend waiting 24 to 48 hours before driving a vehicle on the surface.
  • When is paving season? Work is performed from Spring to Early Fall. Temperatures must be above 10°C to ensure the asphalt compacts and cures with maximum strength.