Understanding your investment helps in accurate budget forecasting. Key drivers include:
- Traffic Load Requirements: Higher asphalt thickness is required for lots serving heavy delivery vehicles.
- Drainage Complexity: The installation of catch basins, storm sewers, and specialized grading for runoff management.
- AODA Compliance: Specialized marking, signage, and precision grading required for accessible parking zones.
- Site Preparation: The volume of excavation and soil removal required to reach stable subgrade.
